Weber Saint-Gobain - Official website of the company

Project Qatar 2013

15 05 2013

Sodamco-Weber unveils last innovations at PROJECT QATAR 2013 (6-9 May 2013)

Project Qatar 2013

For the 10 years anniversary of PROJECT QATAR construction fair, Sodamco-Weber exhibited under the French pavilion with a brand new booth concept, focusing on the last innovations, especially in the Tile Fixing range. The main innovation, weber.col F1, a fast-setting, extra white tile adhesive with Low Dust technology, benefited of premium exposure as it was displayed on the main banner of the stand.

The other tile fixing innovations gained a wide success among the visitors of our stand:


  • weber.joint perfect, a new high performance tile grout, anti-fungus (exclusive MOULD STOP technology), highly resistant to stains, water-repellent with exclusive HYDRO REPELL technology, made to fill joints up to 20mm wide between tiles.
  • Low Dust technology, which allows a reduction by 90% of dust emissions during the pouring and mixing of the tile adhesive (technology available on weber.col plus and weber.col F1 in Qatar)



  • weber.joint glitter (formerly Carrojoint Glitter), a decorative tile grout with metallic effect
  • Reduction of CO2 emissions by 30% due to the use of Green binders for weber.col WP and weber.col plus

Finally, weber fixateur, unveiled for the first time in the Midlle-East, encountered great interest from the contractors, consultants and other visitors of our booth. This fast-drying primer improves the adherence of plasters and monocouche renders, and it does not require curing, thus saving water…

All these innovations, along with some applied products of our 6 different product ranges, have been presented with dynamism by our Sodamco-Weber Qatar team, which showed presence and professionalism during these 4 days of exhibition.

Discover more about the Innovative solutions on … for a sustainable Habitat!